{"id":2342,"date":"2026-06-19T14:06:14","date_gmt":"2026-06-19T14:06:14","guid":{"rendered":"https:\/\/tucsonmovingreport.com\/?p=2342"},"modified":"2026-06-19T14:06:14","modified_gmt":"2026-06-19T14:06:14","slug":"what-travelers-need-to-know-as-san-luis-port-of-entry-construction-expands","status":"publish","type":"post","link":"https:\/\/tucsonmovingreport.com\/?p=2342","title":{"rendered":"What travelers need to know as San Luis Port of Entry construction expands"},"content":{"rendered":"<div>\n<section>\n<p><b>SAN LUIS, AZ (AZFamily)<\/b> \u2014 U.S. Customs and Border Protection (CBP) is urging travelers to plan ahead and prepare for potential delays if they are crossing the southern border, as a new phase of construction begins at the San Luis Port of Entry.<\/p>\n<p>Read more <a href=\"https:\/\/tucsonmovingreport.com\/?p=2340\">Teen charged in deadly crash, accused of driving without license<\/a><\/p>\n<p>The slowdown is tied to a major modernization project at the port, with work scheduled to expand to both sides of the border \u2014 in the United States and Mexico \u2014 starting Friday.<\/p>\n<p>The General Services Administration says the San Luis Port of Entry sees about 3 million drivers and roughly 2.5 million pedestrians cross each year. <\/p>\n<p>The project is aimed at improving traffic flow and reducing wait times, but some nearby business owners say construction that began earlier this year has already cut foot traffic and customers.<\/p>\n<h2>New phase starts Friday<\/h2>\n<p>CBP says the next phase of the $356 million construction project will begin Friday. Earlier work focused on the U.S. side, but this phase will involve construction on both sides of the border.<\/p>\n<p>CBP is advising travelers to expect delays and to give themselves extra time when heading into the United States.<\/p>\n<h2>Travelers brace for longer waits in summer heat<\/h2>\n<p>Eliazar Ramirez, a resident of San Luis R\u00edo Colorado, Mexico, crosses into the U.S. through the San Luis Port of Entry twice a week. He said the construction could ultimately make crossings faster and more efficient, but he worries about the timing.<\/p>\n<p>\u201cFor me, in order to cross, I would have to come earlier,\u201d Ramirez said.<\/p>\n<p>Ramirez said waiting in long lines during extreme summer temperatures can be especially difficult.<\/p>\n<p>\u201cRight now, with this heat waiting in the car, waiting for a long time, is not OK,\u201d he said.<\/p>\n<p>He added that construction should have been scheduled for later in the year.<\/p>\n<p>\u201cThey should have waited and started construction after the summer,\u201d Ramirez said.<\/p>\n<h2>What the project includes<\/h2>\n<p>The modernization project will replace the port\u2019s original 1984 facility with new inspection buildings and infrastructure. Plans include expanding vehicle lanes from eight to 16 to improve traffic flow and efficiency.<\/p>\n<p>Read more <a href=\"https:\/\/tucsonmovingreport.com\/?p=2338\">West Texas group sues Trump admin. over border wall project<\/a><\/p>\n<p>The project also calls for additional processing booths and a new pedestrian inspection building\u2014upgrades intended to reduce the time it takes to walk across the border.<\/p>\n<p>Officials say the work also includes technology upgrades designed to help CBP identify high-risk activity and combat drug trafficking.<\/p>\n<h2>Businesses worry about impact<\/h2>\n<p>While the project is designed to improve crossings in the long term, some businesses near the port say construction has already hurt their bottom line.<\/p>\n<p>Rafael Felix, who works at The Bin Store across the street from the port, said the area has felt noticeably quieter since construction started earlier this year.<\/p>\n<p>\u201cIt\u2019s not organized. It\u2019s affecting our businesses, workers and people,\u201d Felix said.<\/p>\n<p>Felix said the impacts aren\u2019t limited to one storefront.<\/p>\n<p>\u201cIt\u2019s not only affecting this business, but it\u2019s also affecting all the businesses here. The traffic here is dead, and people are not coming to this side of town. It affects us a lot,\u201d he said.<\/p>\n<p>Despite the frustration, Felix said he hopes the project ultimately makes the crossing faster and safer on both sides of the border.<\/p>\n<p>The project is expected to be completed by spring 2029.<\/p>\n<p>CBP is encouraging travelers to check border wait times before leaving home, using the agency\u2019s website or mobile app.<\/p>\n<p><i>See a spelling or grammatical error in our story? <\/i><i>Please click here to report it<\/i><i>.<\/i><\/p>\n<p><i>Do you have a photo or video of a breaking news story? Send <\/i><i>it to us here<\/i><i> with a brief description.<\/i><\/p>\n<p>Read more <a href=\"https:\/\/tucsonmovingreport.com\/?p=2336\">Weekend wonders in southern Arizona<\/a><\/p>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A new phase of San Luis Port of Entry construction could bring longer border waits as summer heat raises concerns for travelers and businesses.<\/p>\n","protected":false},"author":1,"featured_media":2341,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2342","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-interesting"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tucsonmovingreport.com\/?p=2342\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report\" \/>\n<meta property=\"og:description\" content=\"A new phase of San Luis Port of Entry construction could bring longer border waits as summer heat raises concerns for travelers and businesses.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tucsonmovingreport.com\/?p=2342\" \/>\n<meta property=\"og:site_name\" content=\"Tucson Moving Report\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-19T14:06:14+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/#\\\/schema\\\/person\\\/71841c7d449e6ab1ace6bce2f5277255\"},\"headline\":\"What travelers need to know as San Luis Port of Entry construction expands\",\"datePublished\":\"2026-06-19T14:06:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342\"},\"wordCount\":636,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tucsonmovingreport.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ea0c5664d08b926a1242dc682d63e766.avif\",\"articleSection\":[\"Interesting\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342\",\"url\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342\",\"name\":\"What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tucsonmovingreport.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ea0c5664d08b926a1242dc682d63e766.avif\",\"datePublished\":\"2026-06-19T14:06:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/#\\\/schema\\\/person\\\/71841c7d449e6ab1ace6bce2f5277255\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#primaryimage\",\"url\":\"https:\\\/\\\/tucsonmovingreport.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ea0c5664d08b926a1242dc682d63e766.avif\",\"contentUrl\":\"https:\\\/\\\/tucsonmovingreport.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ea0c5664d08b926a1242dc682d63e766.avif\",\"width\":1200,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?p=2342#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tucsonmovingreport.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What travelers need to know as San Luis Port of Entry construction expands\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/#website\",\"url\":\"https:\\\/\\\/tucsonmovingreport.com\\\/\",\"name\":\"Tucson Moving Report\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tucsonmovingreport.com\\\/#\\\/schema\\\/person\\\/71841c7d449e6ab1ace6bce2f5277255\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"http:\\\/\\\/tucsonmovingreport.com\"],\"url\":\"https:\\\/\\\/tucsonmovingreport.com\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tucsonmovingreport.com\/?p=2342","og_locale":"en_US","og_type":"article","og_title":"What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report","og_description":"A new phase of San Luis Port of Entry construction could bring longer border waits as summer heat raises concerns for travelers and businesses.","og_url":"https:\/\/tucsonmovingreport.com\/?p=2342","og_site_name":"Tucson Moving Report","article_published_time":"2026-06-19T14:06:14+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tucsonmovingreport.com\/?p=2342#article","isPartOf":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342"},"author":{"name":"admin","@id":"https:\/\/tucsonmovingreport.com\/#\/schema\/person\/71841c7d449e6ab1ace6bce2f5277255"},"headline":"What travelers need to know as San Luis Port of Entry construction expands","datePublished":"2026-06-19T14:06:14+00:00","mainEntityOfPage":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342"},"wordCount":636,"commentCount":0,"image":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342#primaryimage"},"thumbnailUrl":"https:\/\/tucsonmovingreport.com\/wp-content\/uploads\/2026\/06\/ea0c5664d08b926a1242dc682d63e766.avif","articleSection":["Interesting"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/tucsonmovingreport.com\/?p=2342#respond"]}]},{"@type":"WebPage","@id":"https:\/\/tucsonmovingreport.com\/?p=2342","url":"https:\/\/tucsonmovingreport.com\/?p=2342","name":"What travelers need to know as San Luis Port of Entry construction expands - Tucson Moving Report","isPartOf":{"@id":"https:\/\/tucsonmovingreport.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342#primaryimage"},"image":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342#primaryimage"},"thumbnailUrl":"https:\/\/tucsonmovingreport.com\/wp-content\/uploads\/2026\/06\/ea0c5664d08b926a1242dc682d63e766.avif","datePublished":"2026-06-19T14:06:14+00:00","author":{"@id":"https:\/\/tucsonmovingreport.com\/#\/schema\/person\/71841c7d449e6ab1ace6bce2f5277255"},"breadcrumb":{"@id":"https:\/\/tucsonmovingreport.com\/?p=2342#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tucsonmovingreport.com\/?p=2342"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tucsonmovingreport.com\/?p=2342#primaryimage","url":"https:\/\/tucsonmovingreport.com\/wp-content\/uploads\/2026\/06\/ea0c5664d08b926a1242dc682d63e766.avif","contentUrl":"https:\/\/tucsonmovingreport.com\/wp-content\/uploads\/2026\/06\/ea0c5664d08b926a1242dc682d63e766.avif","width":1200,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/tucsonmovingreport.com\/?p=2342#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tucsonmovingreport.com\/"},{"@type":"ListItem","position":2,"name":"What travelers need to know as San Luis Port of Entry construction expands"}]},{"@type":"WebSite","@id":"https:\/\/tucsonmovingreport.com\/#website","url":"https:\/\/tucsonmovingreport.com\/","name":"Tucson Moving Report","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tucsonmovingreport.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tucsonmovingreport.com\/#\/schema\/person\/71841c7d449e6ab1ace6bce2f5277255","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/50b1ad2e498f523425ee0a8cc5180a210646db1622662a3d56cc405d3e0c346a?s=96&d=mm&r=g","caption":"admin"},"sameAs":["http:\/\/tucsonmovingreport.com"],"url":"https:\/\/tucsonmovingreport.com\/?author=1"}]}},"_links":{"self":[{"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/posts\/2342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2342"}],"version-history":[{"count":0,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/posts\/2342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=\/wp\/v2\/media\/2341"}],"wp:attachment":[{"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tucsonmovingreport.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}